our facilities
utilising worldwide points of presence
ThinkGrid typically uses Tier 3 & 4 data centre facilities to act as points of presence ('POPs'), which serve local regions with the lowest possible latency services. Currently we are present in 6 data centres in the UK, US and Australia, with full redundancy between sites using the latest virtualization technologies.

Tier 3 & 4 carrier neutral data centers
Our facilities have the following minimum specs:
Commercial Power
  • Two separate power feeds provided
  • Power supplied from two separate substations. Four transformers at 3,750 KVA each.
  • Four PDUs (power distribution units), each having primary and backup.
  • CPS (continuous power supply) that serves each data room (N+1).

  • Generator
  • Building can operate at 100% connected load on five HiTecs and two standby generators.
  • Six PowerWave 'state-of-the-art' UPS systems continuously generating power for N+1 redundancy.
  • The PowerWave system feeds redundant switchgear providing power to mission critical loads.
  • Two 2-megawatt standby generators serve facility essential loads. N+1 capacity.
  • One 2-megawatt stationary load bank, for bypass testing and duty cycle maintenance.
     
    DC Power System
  • 1600 AMP redundant DC battery system.
     
    Diesel Fuel Supply
  • 20,000 gallons on-site. Facility on the emergency fuel list.
     
    HVAC (Heating, Ventilation and Air-Conditioning)
  • 3,350 tons total refrigeration capacity with N+2 redundancy (5 chillers at 670 tons each).
  • 30-ton CRAC (Computer Room Air Conditioner) units inside our data room.
  • Five cooling towers
  • Five chilled water pumps
  • Five condenser water pumps
  • Five chemical treatment stations
     
    Fire Suppression
  • Dry pipe, pre-action system enabled by activation of VESDA (Very Early Smoke Detection Alarm) and / or smoke detectors. Loss of air pressure in the pipes caused by a broken sprinkler head will cause water to discharge only if smoke detection is present. The system is monitored 24x7 by onsite personnel.






  • Take a test drive of cloud computing services.


    Join our next online presentation to learn more about cloud computing services.
    Dates Still Available
     

     
    Chat Live with us Now

    Sitemap     Privacy Policy     Terms and Conditions